Electric.ie March/April 2020

ELECTRIC.IE • The Magazine & Website for the Irish Electrical Industry • 55 Case Study Install a full fire alarm system to IS.3218-2013 and emergency lighting to IS.3217-2013. Design and install a complete electrical containment and power installation. Solutions: The main area was covered by a special circular LED from the Tegral range which limited vision above the light and created a ‘virtual ceiling’. The Spin Room was fitted with a combination of suspended circular fittings and RGB LED striplighting formed into various shapes. Power supply to the array of training machines on the floor caused a particular problem. This was overcome by the installation of bench trunking and a containment system in the ceiling space. The finishing touch was the wiring and installation of a comprehensive sound and video system with multiple screens (by Jay Shiels Electrical Supplies) which can be totally controlled by the management. Result: A complete installation designed, managed and signed off by the H.Shiels team within 12 weeks. Philip Whelan, H Shiels, Nial Dunne, ESL and Keith Harris of Tegral Lighting. The Project Team: Gerry Dunleavy and Ronnie Greaney of WhitCroft Developments, Vincent Burke of Martin Murray Architects, Philip Whelan of H Shiels, Graham Harmon of Tony Harmon Services and Tom Fitzgerald of Planet Leisure Limited. Donal Clarke of ESPI talks to Philip Whelan of H Shiels.

RkJQdWJsaXNoZXIy Mzk5MjA=