NewsEIFIMulti-level terminal blocks for building installation save space

Multi-level terminal blocks for building installation save space

-

- Advertisment -

The installation terminal blocks from Phoenix Contact impress by their low and compact design. Using them, building installations can be set up in a quick and space-saving way. The new UTI 6 multi-level terminal blocks are suitable for conductors up to 10 mm².

Double function shafts on each level ensure a time-saving three-phase distribution in the terminal strip. Every terminal point can be clearly marked and seen in every terminal block mounting position.

All neutral conductor disconnect terminal blocks are fitted with a robust, screwless disconnect slide for easy and secure N disconnection. It latches in the end positions. The UTI installation terminal blocks with screw connection are compatible with the installation system of Phoenix Contact and have the same system features as the Clipline complete terminal block system.

Colin Sherlock
Colin Sherlock
Colin is the General Manager of Electric.ie
spot_imgspot_imgspot_img

Latest News

Dash of the Derg : 8-10 Week Training Plan

The Dash of the Derg charity bike event organised by the Irish Electrical Cycling Club (IECC), is a fantastic...

Cutterwell: A Trusted Cable Management Legacy, Now Available in Ireland

A familiar range of high-quality cable management products has a new name and is now available across the Republic...

Grant invests €8 million in next-generation cylinder range and manufacturing expansion

Leading manufacturer of sustainable home heating solutions, Grant has launched a new generation of hot water cylinders, designed to...

GARO Expands Its Renewables Offering with the Launch of New PV Inverters and Battery Energy Storage Systems

Ireland's transition toward a cleaner, smarter and more resilient energy future continues to gather pace. Rising electricity costs, growing...

Euro Sales Hosts Fegime Finland and Baltic Delegation in Dublin

Knowledge sharing, innovation and networking take centre stage during international visit. Euro Sales recently welcomed a distinguished delegation from Fegime...

RFE: Smarter Monitoring, Predictive Maintenance, Protected Assets

New safety and condition-monitoring solutions aim to reduce downtime, improve electrical asset visibility, and support the shift from reactive...

Must read

September 4th – A Date for the Diary – Dash of the Derg 2026

The much‑loved Dash of the Derg charity cycle returns...

CEF – Commercial Manager

CEF are seeking an experienced and commercially astute Commercial...
- Advertisement -spot_imgspot_img

You might also likeRELATED
Recommended to you